CMRL: Unfazed by Challenges

Thiru Pankaj Kumar Bansal, I.A.S, Managing Director, Chennai Metro Rail Limited
With the inauguration of the final 10-km stretch between AG-DMS and Washermanpet, the entire 45-km first phase of the Chennai Metro rail network is now up and running. Thiru Pankaj Kumar Bansal, I.A.S, Managing Director, Chennai Metro Rail Limited (CMRL), discusses with Maria R, the challenges and initiatives to integrate the Metro with other public transport systems.

What were the challenges faced in the construction of the 10-km stretch which is entirely underground?

Chennai Central Metro was envisioned as a unique underground metro station and achieving the objectives of inter-modal connectivity with close co-ordination with all the stakeholders was a challenge. It was a huge task to carry out such a massive project in the core part of the city. Working in an urban environment comes with its own set of constraints. In city junctions, land availability is a major constraint and executing the work within a small constricted area proved to be a challenge. There are many other hurdles to be tackled in terms of logistics, material storage within the limited space, movement of materials and equipment from other locations.

During the course of execution, the standard of living has increased considerably, so delivering a sophisticated and state-of-the-art Metro network becomes a key aspect of construction. Effective implementation was largely dependent on planning and adherence to timelines by all the stakeholders.

Stage-wise traffic diversion schemes were implemented to avoid complete closure of road sections near the work areas. Safe implementation of the underground works located in an area of high water table relied upon effective dewatering operations.

Chennai Metro Rail

What underground / tunneling methodo- logies and technologies were used?


Bottom Up method and Top Down method have been followed with D’Wall (Diaphragm wall) construction for the underground section. Closed Face Earth Pressure Balancing (EPB) tunneling machines were used and additional control measures were taken in high risk and sensitive areas.

What are your initiatives and plans to integrate Chennai Metro with other public transport systems to ensure seamless travel and last mile connectivity?

Chennai Metro Rail Limited (CMRL) is advocating Multi-Modal Integration (MMI) to ensure better mobility for metro users and for people using other means of public transport. During the implementation of Phase-1, the integration concept was broadly considered and thus the Metro is connecting the city’s important bus/rail/air transport hubs - the Inter-city Bus Terminal – Koyambedu, Rail Terminal - Chennai Central and Egmore, and Air Terminal – Chennai Airport.

In order to provide seamless connectivity to Metro Rail commuters, CMRL is continuously co-ordinating with other stakeholders such as Greater Chennai Corporation (GCC), Metropolitan Transport Corporation (MTC), Highways Department, Chennai Metropolitan Development Authority (CMDA) w.r.t. various activities like provision of feeder bus services, better access roads to stations, development of footpaths on station access roads, installation of traffic information signage boards at stations’ vicinity area, relocation of city bus stops closer to stations, formation of missing links, construction of foot-over-bridges, etc.

In addition to this, CMRL is operating own feeder services for select metro stations through share auto/minicab. Further, a bicycle sharing system is made available for free and shared use to metro passengers on a short-term basis. CMRL is planning to operate a full-fledged app-based feeder services for all stations.

Chennai Metro Rail

Is CMRL also considering the light Rail Transit or monorail system as feeder services?

In order to meet future traffic demand, the expansion of mass transit corridor is an imperative.The present stand-alone Metro system of 45 km by itself is not sufficient to address the traffic needs of Chennai. So, there is a case for considering expansion of Mass Transit options.

In this context, Chennai Metro Rail Limited is currently working on Metro Rail Phase-2 expansion. Multi-Modal Integration Strategy has also been built into the planning of CMRL Phase-2. The proposed Chennai Metro Rail Phase-2 will integrate with the existing sub-urban rail, MRTS, Phase-1 of Metro and City Bus Terminals at 21 different locations; the details of which are as follows:

Type Corridor 3 (Madhavaram – SIPCOT) Corridor 4
(Light House- Poonamallee Bypass)
Corridor 5 (Madhavaram – Sholinganallur)
Metro-Metro/MRTS Madhavaram, KMC, Thirumayilai, Thiruvanmiyur Sholinganallur Vadapalani, Nandanam, Thirumayilai Madhavaram, CMBT, Alandur, St. Thomas Mount, Shollinganallur
Metro-Bus Ayanavaram, Mandaiveli, Adyar Poonamalle Annanagar, Villivakkam, CMBT
Metro-Sub-urban Rail Perambur, Chetpet Kodambakkam Villivakkam, St. Thomas Mount

Please share some details of Phase-2 project of Chennai Metro Rail.

Phase-2 expansion of 118.9 km metro rail network with 128 stations, has three corridors i.e. Corridor-3 from Madhavaram to Sipcot (45.8 km); Corridor-4 from Lighthouse to Poonamalle Bypass (26.1 km); and Corridor-5 from Madhavaram to Sholinganallur (47 km). The estimated cost of the project is ₹69,180 crore. About 65% of the corridors in Phase-2 are elevated sections and the remaining are underground. The soil investigation and detailed design work are in progress. The project is scheduled to be completed by end of 2026.

The learnings from Phase-1 implementation has resulted in a detailed study on station size reduction. Compared to Phase-1 stations, the structures planned in Phase-2 will be optimized, more sleek and will require less land.

TBM tunnelling has proven to be a successful method and the same will be considered in Phase-2. Energy saving methods and green technology have been ingrained in the sustainable design and construction concepts implemented by CMRL and the same have been integrated in the design of Phase-2.

The construction activity for the priority corridor is likely to be started from April 2020. Presently, the design and geo-technical investigation works are being undertaken by CMRL through various agencies / consultants.

Chennai Metro Rail

As a recipient of the prestigious Platinum Rating from the Indian Green Building Council (IGBC) for all the 32 Metro Stations of Phase-1, CMRL has entered the ‘green zone’. What green features will be incorporated in the Phase 2 project?

All the stations in Phase-2 will be designed as green buildings. Efforts will be made for providing solar power to the extent possible; water consumption will be substantially reduced as chiller plant technology in underground stations is being replaced by VRF technology, which will have nil water consumption. Impetus will be given for using non-fossil fuel in vehicles operated for last mile connectivity.

What are the critical issues and challenges in the development of metro rail system in India today?

Land acquisition and working with various stakeholders; working in congested urban environments while ensuring safety, are some of the critical challenges. Standardization and indigenization is the need of the hour.

NBM&CW August 2019

L&T: EPC Expert in Airport Construction

M. V. Satish, Whole Time Director & Senior Executive Vice President (Buildings, Minerals & Metals) of L&T Construction discusses the challenges and scope of infra development in both greenfield and brownfield airports and the company's Read More ...

Jindal Aluminium Limited: Preferred Supplier

Aluminium is becoming an integral part of infra construction projects like Metros, Smart Cities, etc. purely due to the material’s sustainable nature, avers Pragun Jindal Khaitan, MD, Jindal Aluminium Limited, and envisages demand Read More ...

Growth Ahead - Gurvinder Singh, Director, Amrik Singh & Sons Crane Service

We foresee a huge demand for cranes and other heavy vehicles in the Indian Infrastructure and logistic industry. In addition to the ongoing projects, multiple projects are expected to start within the next few months. These include major Read More ...

Globe Ecologistics Making Inroads

Major changes in the last decade include upgradation of technology of Vehicles & GPRS Technology with IT software, which have given better output/intime to logistical services. Even road infrastructure has improved a lot. At present Read More ...

Jungheinrich: Customizing Solutions for India

The Indian market is becoming more competitive and more players are coming in; it’s a challenge and also an opportunity for the industry to grow and upgrade, avers Manojit Acharya, MD, Jungheinrich India, during an interview with Maria R. Read More ...

ACE: Growing Capacity to become leading MHE Supplier

ACE offers a diverse range of material handling equipment to cater to the diverse needs of the warehousing industry. Under the MHE segment, we offer Diesel Forklift (1.5T-3.5T), Electric Forklift (1.5T-8.0T), LPG Forklift (35T), and an Read More ...

Putzmeister - Mechanization is Key

Ambitious development targets and increasing pressure to complete projects on time require an increased adoption of mechanization. As a result, although there are indications of an economic slowdown, we are seeing a steady demand Read More ...

Manitou India: Meeting Challenges Head-On

Manitou is bullish of driving its business of telehandlers, skid steer loaders and backhoe loaders in India as the demand potential of our solutions is quite promising. This is due to multiple factors, many of which are fundamental Read More ...

Escorts: Making Inroads into Global Markets

If you see global trends, we can say that our machines are at par with global features and technology integration. People are moving to safer equipment, autonomous operations, operator comfort, and are looking at highly efficient Read More ...

Terex: Indian at Heart

We are currently working on various new product development projects for the Indian and regional markets. There are multiple new models planned to be launched for our modular range and also some very exciting new additions for the Read More ...

Sachin Bhandari, CEO, VTP Realty

The Infrastructure sector is the backbone of the Indian economy as it is responsible for propelling the country’s overall development. The sector, therefore, requires dedicated focus from the government, which must formulate Read More ...

Jatin Goel, Executive Director, Omaxe Ltd

Infrastructure construction is expected to intensify in the next few years. The sector has seen dips and stagnancy, and now, with a stable government at the Centre, the sector should see a steady growth with the huge spend on Read More ...

Arun. G. Rao, Head of Engineering, - Assetz Property Group

Over the last few years, the growth graph of the Indian Infrastructure construction sector has been at a constant rise owing to the increase in housing demand. The development of highways, roads, metros, etc. has created a feasible Read More ...

Rajagopalan T S, Vice President – Projects, Adarsh Developers

The Infrastructure sector is responsible for propelling India's overall development with world-class infrastructure that includes bridges, dams, roads, urban development, power, ports etc. India requires investment worth ₹50 Read More ...

Madhusudhan G., Chairman & MD, Sumadhura Group

According to a report, the Indian construction industry is poised to become the third largest in the world by the year 2025 and expected to reach a market size of $1 trillion by 2030. Factors such as rapid urbanisation, emergence Read More ...

José Braganza, Joint Managing Director, B&F Ventures

The trio of GST, DE-MO and RERA was introduced with an objective to curb the black money dumping in the infrastructure and construction sector. This move has brought an enormous change in the way the sector was conducting business Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week