The demand for skid plants is on the rise, as more customers are preferring a skid mounted plant to a stationary one. Customers accelerate their projects with NAWA skid-mounted plants. Skids are assembled in NAWA's modern, purpose-built workshops.

In the skid mounted plant, the equipment is placed on self-supporting structure and assembled in the shop, and inspected prior to delivery. Few items are shipped separately for assembly at site. Skid-mounted design helps reduce the erection, assembly and start-up time at the site; thus saving time and cost of labor, supervision, and coordination at customer's end.
The modular assembly includes the installation of; Steel structure, Equipment, Piping and valves, Instrumentation, Cabling and junctions boxes, Insulation.
PST1108 JAW SKID MOUNTED PLANT

Technical Specification
Jaw Crusher : PST1108
Grizzly Feeder : TVG1245
Hopper : 12 Cu.m
Product Conveyor : 1000 W x 8700 L
Capacity : 200 - 300 TPH
Total Power : 139.5 kW
Total Installation Weight : 45 Ton
Automatic Lubrication : Optional
SRM300 SKID MOUNTED PLANTSuperior NAWACONE Crusher Plant

Technical Specification
Cone Crusher : SRM300
Vibrating Screen : MF1848-4D
Total Power : 209 kW
Feed Opening : 235-200 mm (Extra Coarse)
Capacity : 100 - 440 TPH
Total Installation Weight : 45 Ton
Automatic Lubrication : Optional

Advantages of skid-mounted turn-key plants are:
- The skids can be assembled at site quickly. Short delivery time through an integrated fast track execution.
- The skid construction is carried out under supervision of experienced engineers at the factory; thereby reducing chances of errors. Manufacturing under workshop conditions (fast, clean and reliable) Qualification test prior to delivery Similar construction at site is not subject to similar quality control. In many cases, experienced or skilled workers or appropriate equipment is not available at sites thereby impacting the quality and completion dates
- Reduced on-site erection time (8 hours) and thus minimal site disruption. Skid-mounted plants can be relocated more easily than the plants erected at site.
- Low overall investment costs