Layher Allround TG 60 – The Ideal Shoring System

Mithilesh Kumar
Layher Group produces high-quality scaffolding systems in Germany which are being used by industries like construction, chemical plants, power plants, at shipyards and offshore. The company has worldwide presence with over 30 sales subsidiaries.

More Possibilities - Layher Products and Services

Layher’s product characteristics and services help customers to achieve long-term success and increase the profitability of their companies. The Layher Allround Scaffolding has been established as a synonym for modular scaffolds on the market and offers unsurpassed versatility to be used in varied application areas.

Layher Allround shoring TG 60, (The False work frame – even more possibilities in Allround Scaffolding) - Allround scaffolding uses a simple, unique and bolt free connection technology. Sliding the wedge head over the rosette and inserting the wedge into the opening immediately secures the component. There is still sufficient play to secure the other end of the ledger. A hammer blow to the wedge transforms the loose connection into a superbly strong structurally rigid one. The face of the wedge head is now precisely positioned against the standard.

Layher
The new Layher Allround false-work frames have been developed as an extension of the Allround Scaffolding Systems. With three new additional parts, we can assemble false-work towers even faster higher and sturdier. The shoring frames TG 60 are available in three sizes: 1.00 x 1.09 m, 0.50 x 1.09 m and 0.71 x 1.09 m. The base frame H = 0.71 m is equipped with Allround rosettes at the top and the bottom and has no spigot.

The false work frames are made of steel tube of high strength and are stiffened with 2 small diagonal braces. Every vertical standard can be loaded with up to approx. 6 tons. The ends of the welded ledgers and diagonal brace are fattened. This makes the Allround rosette fully useable.

To transfer pulling force, every frame is secured by locking pins or bolts to each other. In this way the tower can be assembled on the ground and placed by crane.

The product innovation is assembled out of the newly developed Allround Shoring Frame TG 60 as well as Allround standard parts like ledgers and diagonal braces. In this way the advantages are intelligently combined: Quick assembly and dismantling thanks to reduced number of components, light component weight, and screwless wedge lock connection technique and optimum material utilisation as a result of variable bay lengths. These can be adapted flexibly to the existing loads and the grid dimension of the formwork beams. Scaffolding companies increase assembly speed with it due to their day to day experience and moreover offer an attractive full package: They implement requests of the building contractors no-site without any difficulty with the Allround construction kit – whether they are exact adaptations to difficult building geometries, extensions like production stages and stair towers or supplementary solutions, for example concreting platforms and bracing scaffolding.

Application of Allround Shoring TG 60

Layher
For the construction of a continuous casting system, the new Allround Shoring TG 60 from Layher permitted work at 40 metres up, for concreting a 25 metre long binding beam – with a dead weight of 21 tonnes per metre.
For the greatest possible efficiency in the construction of the 46 metres long and 28 metres wide shoring tower structure, the scaffolding company considered all three construction phases already during the planning: setting up the moulds for the down stand beams, laying and concreting of the semi-finished ceilings as well as creation of the upper floors. In accordance with specifications the scaffolders utilised the material-saving 1.09 metres wide and 1.57 metres long tower versions, which sped up the procedure and simplified logistics. In longitudinal direction they connected the shoring towers at the head of the tower with two 1.09 metres scaffold bays each and one built-in Allround ledger. With the aid of the system components, elaborate calibration was obsolete: After erecting the shoring tower for the first beam axis, the further assembly resulted from the dimensions of the system components and the automatic rectangularity.

On the one hand the scaffolders adapted the 6.5 metres high shoring tower structure exactly to the grid of the down-stand beams and at the same time created ideal prerequisites for the second and third construction phase. The reconstruction work was therefore reduced to the minimum: As a support for the concreting of the semi-finished ceilings, the shoring tower structure was simply raised to the bottom edge of the semi-finished ceiling by inserting a 2.5 metres high Allround standard onto the Allround standard already integrated in the connecting bays. The loads were absorbed by the intermediate bay and transferred directly into the adjoining shoring towers by means of diagonal braces, which made the assembly of additional shoring towers underneath the ceiling obsolete. When building the upper floor, load concentrations were absorbed by square shoring towers the scaffolders had erected here and there in the intermediate bays. Around 100 tons of scaffolding material were used altogether – exclusively Allround standard parts with well-thought-out screw-less wedge lock connection.

To assemble the 600 square metre structure, scaffolding company, this helped to speed up assembly to its experience. In view of the heavy loads, the scaffolding experts chose square shoring towers with a ground plan of 1.09 x 1.09 metres, linked to Allround ledgers and diagonal braces by wedge head connectors and braced – meaning without additional connections using tubes and couplers. The combining of frames, in order to increase load-bearing capacity in the area of the almost seven metre high wall slabs too, was achieved using Allround ledgers with short intermediate bays. During measuring of the shoring towers, the use of standard Allround Scaffolding components likewise permits a considerable time saving. After assembly of a single tower, the distance to the next tower results automatically with the system dimension from right-angled positioning of Allround ledgers on the ground.

Layher
Allround TG 60 for support of heavy structure
The scaffolding solution was also persuasive when it came to flexibility: the Allround Shoring TG 60 was able, thanks to its two shoring frames of differing height and by the spindle extension length, to compensate for height differences in the angled ceiling and in the slightly sloping ground. The width of the shoring was precisely adapted to the tapering form of the wall of the inlet and outlet structure by intermediate bays of variable width made from Allround equipment, or by extensions in the edge area using Allround standards. It was also possible using simple Allround brackets to build the working levels for the formwork on the wall slab and binding beam, or to construct the site accesses quickly using Allround stairway towers. 150 tons of scaffolding material were used in all, which Layher delivered to the site right on schedule and in a very short time when requested.

The safe assembly sequence for Allround Shoring TG 60 automatically provides scaffolding erectors with all-round side protection, even without additional components, during upright assembly. This allows the valid safety regulations to be met in full for the first time. The use of the new Allround Shoring TG 60 thus ensured crucial advantages for Scaffolding Company: compliance with the tight schedules required by project planning, optimum working conditions for the formwork and a high degree of safety during assembly work.
NBM&CW July 2017
ULMA’s ONADEK set to revolutionize Deck Formwork systems

ULMA’s ONADEK set to revolutionize Deck Formwork systems

Ulma has introduced Recoverable Modular Formwork ONADEK, which, according to Surajit Ray, Managing Director, is set to start a new era in the deck formwork system. “It is a high-performing slab formwork system with easy assembly and maximum

Read more ...

Doka upgrades Framax Xlife plus; 3.00 meter height added to next-generation tie system

Doka upgrades Framax Xlife plus; 3.00 meter height added to next-generation tie system

Doka is responding to evolving market needs by introducing a new system height to its popular Doka Framax Framed Formwork range. Framax Xlife plus is a patented, next-generation tie-system designed for lightning-fast assembly. New accessories

Read more ...

PERI presents innovative technologies for material-efficient project management

PERI presents innovative technologies for material-efficient project management

With more than 60 subsidiaries and over 160 warehouse locations, Germany-based PERI provides its customers with innovative system equipment and comprehensive services relating to all aspects of formwork and scaffolding

Read more ...

Altrad RMD Kwikform Recommends Ground Shoring Equipment for Excavations to Combat Steel Price Hikes

Altrad RMD Kwikform Recommends Ground Shoring Equipment for Excavations to Combat Steel Price Hikes

With steel prices on the rise, global formwork, falsework, and ground shoring provider, ALTRAD RMD Kwikform (ARMDK) is advising the construction industry to consider alternatives to structural steel for excavations. Peter Atkinson, Business Development Manager

Read more ...

Foundation & Piling Rigs

Foundation & Piling Rigs

Demand fundamentals for foundation and piling equipment remain firm, led by development of large-scale transportation infrastructure projects. However, actual acquisition of machineries remains volatile due to a range of techno commercial factors. To drive sales

Read more ...

Sharp Ply Keeping Ready Stock of H-Beams at Warehouses Across India

Sharp Ply Keeping Ready Stock of H-Beams at Warehouses Across India

Sharp Ply (India) in association with Mywood, Germany is positioned as a strong player in the formwork market. The company has been dealing with H20 Beams (EN13377 Certified) since 2016 and is also importing H16 Beams to meet the requirements at project sites

Read more ...

Aadhar Equipments to expand its scaffolding solutions across India

Aadhar Equipments to expand its scaffolding solutions across India

We offer complete scaffolding, staging, and shuttering solutions in steel. Having established a strong base in the western region, we now plan to expand to other parts of the country. When it comes to formwork, there is no one size that fits all. The design varies from

Read more ...

Stockholm Bypass - Skärholmen Tunnel - An all-round success

Stockholm Bypass - Skärholmen Tunnel - An all-round success

Whenever people talk about the quality of life, Stockholm is at the top of the list. To keep it at the top, the city is digging deep. A new superhighway, mostly designed as a tunnel, is intended to guide traffic around the city

Read more ...

Plywood for Concrete Shuttering Work Film Face Shuttering Plywood

Plywood for Concrete Shuttering Work Film Face Shuttering Plywood

India’s top shuttering plywood brand ALLIANCE manufactured by Sunrise Panels, is a high value product and especially designed for use in high quality construction work. Due to its superior performance, ALLIANCE is highly

Read more ...

Kömürhan Bridge - How Doka is literally putting the ‘Y’ in Turkey

Kömürhan Bridge - How Doka is literally putting the ‘Y’ in Turkey

Constructed over the Karakaya Dam Lake, the Kömürhan Bridge will soon forge part of the Malatya-Elazig State highway in Eastern Turkey. Measuring 600 metres in length, the bridge features a cable-stayed design with a single pylon

Read more ...

Sharp Ply introduces ECP doors and window frames based on the concept of WPC

Sharp Ply introduces ECP doors and window frames based on the concept of WPC

Sharp Ply, known for its innovations, has unveiled ECP doors and window frames based on the concept of WPC (wood & PVC composites), which has the advantages of both the materials. Engineered Composite Profile (ECP) is a unique

Read more ...

Modern Scaffolds - Designed to be Faster, Safer, Dependable

Modern Scaffolds - Designed to be Faster, Safer, Dependable

Modern Scaffolding systems are witnessing rapid strides as their faster erection and dismantling, safety features, and quicker maintenance are enabling timely project execution, so much so that the traditional timber and bamboo

Read more ...

Doka’s formwork solutions deployed for special design of two towers of New VakifBank headquarters

Doka’s formwork solutions deployed for special design of two towers of New VakifBank headquarters

With the new headquarters of VakifBank, Istanbul is now in the process of becoming a financial capital. Covering a total area of 690,000 m² with 257,464m² of usable area, the office construction will be one of the most spectacular

Read more ...

Layher's Allround Scaffolding: Innovative Concept for Bridge Construction & Repair

Layher's Allround Scaffolding: Innovative Concept for Bridge Construction & Repair

For more than 70 years, the Layher name has been synonymous with high-quality and practically tested scaffolding systems. The Layher brand is present worldwide with more than 30 sales subsidiaries. Layher products are used

Read more ...

The New Orbital Highway and Truck Route

The New Orbital Highway and Truck Route

With both the national Vision 2030 and the FIFA World Cup 2022, Qatar isn't short of reasons to ensure its national infrastructure is delivered. Furthermore, to showcase itself as a sustainable and technologically advanced

Read more ...

Sunrise Plywood Industries - Only company in India manufacturing Birch Plywood

Sunrise Plywood Industries - Only company in India manufacturing Birch Plywood

Sunrise Plywood Industries, established in 2004, is considered a pioneer in the field of Film Face Shuttering Plywood. For the last 15 years, the company has been in the line of production for the Construction sector only. In 2017

Read more ...

Sharp Ply introduces imported H16 Formwork Beams

Sharp Ply introduces imported H16 Formwork Beams

Sharp Ply (India) Pvt Ltd. in association with Mywood has launched a new product line - H16 in the formwork beam segment for the Indian market. The new H16 is compliant with European norms and is set to counter indigenous competition

Read more ...

Nav Nirman launches Neo Alumax & Neo Formwork for Vertical Structures

Nav Nirman launches Neo Alumax & Neo Formwork for Vertical Structures

Nav Nirman, with its expertise of over 15 years in the field of Formwork, has introduced the (only) Made in India Neo Alumax and Neo, which are amongst the most advanced and versatile systems for all types of vertical structures

Read more ...

Green residential tower grows with VARIOKIT

Green residential tower grows with VARIOKIT

The Aglaya high-rise building is situated in the so-called Suurstoffi area in Risch Rotkreuz (Switzerland) next to Lake Zug. In a unique way, it combines the increasing desire of living in a green environment with careful

Read more ...

To get latest updates on whatsapp, Save +91 93545 87773 and send us a 'Saved' message
Click Here to Subscribe to Our eNewsletter.