Sandvik DT 821C Tunneling Jumbo

A tunnelling project is a race against time and costs. Getting it right from the very beginning requires knowledge, skill and experience, as well as a proper range of equipment that fulfils the customer’s tunnelling requirement. Sandvik has been giving drilling solutions for more than 50 years, by creating cutting-edge technology that meet the needs of modern-day tunnelling.

Sandvik 800 series DT821C is a twin boom electrohydraulic semi-automatic tunnelling Jumbo that offers the right solution for any tunnelling application like face drilling, bolt hole drilling, and mechanized long-hole drilling. It provides efficiency and accuracy along with reliable performance.

The fast and user-friendly Jumbo produces excavation results of the highest quality and with the lowest costs. Its hydraulic rigs-controlled systems with advanced automatic functions include MWD (Measure While Drilling) data collection and hole length control system as per the drill plan.

Advanced Intelligence
To produce the highest repeatability and the best possible excavation predictability, the DT821C is loaded with Sandvik T-CAD+ and iSURE® 8.0, a revolutionary tunnel management tool, which offers an efficient way of designing blasting and drilling pattern. The iSURE® ensures accurate drilling and optimized blasting according to plan that gives better pull-out, significant reduction in scaling costs, better mucking efficiency, and smoother collaring in the following round.

iSURE® uses the most critical spot, the blast plane, as the basis for the whole planning process. As the drill plan is implemented to fit the blasting plane, the hole bottom spacing and the burdens will be adjusted accordingly; the used charge defined and the cracking zone examined. As a result, hole locations and blasting are optimized. A range of practical features will allow the operator to fine-tune the process online, depending on the rock conditions.

Sandvik DT 821C Tunneling Jumbo

Efficiency and Accuracy
The drilling speed and exceptional accuracy of the Sandvik DT821C Jumbo stems from the combination of high-performance RD520 / RD525 rock drills, robust booms, advanced drill string guides, and an advanced control system. Accurate positioning using any navigation methods and precision in drilling maximizes the round performance because of significant reduction in over-breaks / under-breaks. This leads to direct savings in the costs of additional spraying or secondary blasting.

Control system and Instrumentation
The control system on Sandvik DT821C offers a wide range of practical features which greatly improve the drilling accuracy and performance. Features include an automatic percussion feed control that optimizes drilling pressure level with the pre-set limit values, hinders over and underfeeding, and enhances the life of rock tools and the rock drill.

The noise and vibration insulated FOPS cabin loaded with a high level of instrumentation, provides ergonomic and extremely comfortable working place with excellent visibility. The operator makes a smooth ride on the DT821C even when working in the toughest of terrains.

Furthermore, Sandvik drill steel, various retrofit kits, ready-made maintenance kits and genuine spare parts supported with 24x7 services, ensure trouble-free drilling all the time and allow you to maximize productivity.
Click Here
To Know More / Contact The Manufacturer
Please fill in your details, we will contact you as soon as possible
Choose Title from the listPlease let us know your name.
Please let us know your Designation.
Invalid Input
Please let us know your email address.
Please let us know your City.
Please let us know your Contact Number.
Please brief your query.
Our other value-added services:

To receive updates through e-mail on Products, New Technologies & Equipment, please select the Product Category(s) you are interested in and click 'Submit'. This will help you save time plus you will get the best price quotations from many manufacturers, which you can then evaluate and negotiate.

Equipment & Machinery
Invalid Input
Building Products
Invalid Input
Invalid Input

India’s Tunnelling Industry Opportunities & Challenges

The growth of the tunnel construction in the country has been driven by a robust pipeline of projects and investments in setting up hydropower projects, developing urban mass rapid transit systems, improving road Read More ...

Klang Valley Mass Rapid Transit Putrajaya Line in Malaysia

Stoked by their debut success with the timely completion of Kajang Line’s underground section, Gamuda Engineering found themselves pitted once more against the unique challenges of tunnelling in Kuala Lumpur Read More ...

German manufacturer GHH brings special Shotcreting Machine to help complete Mumbai Nagpur Expressway

The Mumbai-Nagpur Expressway is delayed until 2022. In the meantime, a machine ‘GHH IS26’ with remarkable reliability has been specially flown in from the supplier and is in operation to help complete the project Read More ...

CRCHI’s EPB TBM ‘Victory’ Achieves New Records in Construction of Moscow Metro

The project, located at the riverside of the Moscow River, passes under heavy traffic and crowded buildings. It includes two sections of a total length of 2947m. One is from Maple Avenue Station to No.2 Working Shaft Read More ...

Pull Force

Pull Force is the force that a truck or prime mover can exert onto a transporter or any type of trailer. It has been a subject of much controversy and misunderstandings as truck manufacturers and end-users often do not talk Read More ...

Fully Automated Jumbo Revolutionizing Tunneling in India

The first Sandvik DT922i, a computer controlled fully automatic tunneling jumbo, has been introduced by Sandvik Mining and Rock Technology in India with a vision to achieve high levels of safety, productivity and Read More ...

HDD Machines Best Suited for Gas, Cable, and Sewerage Pipeline Projects

Horizontal Directional Drilling is a technology in pipe and utility installation that allows greater accuracy and flexibility in placement and ends the need for costly digging, large crews, road closures and other Read More ...

Progress Maschinen & Automation: Reinforcing cages for tunnel construction and wind-energy solutions

Special knowledge is required for building tunnels and wind energy plants in order to implement demanding projects. The facilities and manufacturing processes required for such projects can be adjusted well in advance for Read More ...

Tunnelling for Science - Special formworks from Doka for tunnel system at CERN

The Large Hadron Collider (LHC) at CERN is the biggest particle accelerator in the world – and growing. To equip the LHC for new, more ambitious experiments in the next decade, the accelerator is currently Read More ...

Proven Technology in Use

The river has its source at over 3000 meters high in the snow-covered Andes. It reaches the Pacific Ocean after 250 km. On its way, it overcomes a considerable gradient and is, therefore, ideally suited to generate electricity Read More ...

CREG: Distinctive Amongst Peers

Tan Shunhui, Chairman, CREG, discusses the competitive advantages of the company’s tunneling equipment and solutions, emerging opportunities in developing countries, factors driving its growth and success across Read More ...

CRCHI TBM at work in Hangzhou Genshan East Road Crossing River Tunnel

15-meter mega Slurry TBM rolled off the assembly line at CRCHI. The excavation diameter of the equipment is 15.01 m, its total length is about 130 m, total weight is about 4300 t, installed power is about 9755 kW, rated Read More ...

Open-type TBM produced by CRCHI creates a new record in China

Being the longest water delivery line in the history of Jilin province, transferring water from Songhua River into Central Jilin Province will transfer the largest capacity of water and cover the largest areas. The water diversion Read More ...

Composite Shell Lining for Tunnels and Mined Stations

Amit Kaul, BASF India Limited (Construction Chemicals Division), India, tells about the innovative tunnel lining system and related design aspects, and also describes the main advantages of this lining system in comparison Read More ...

Impact of Underground Construction n Urban-Built Environments

Underground infrastructures are an integral part of modern cities as they serve to counter problems of surface congestion and environmental degradation. The problems of ground vibrations, vibration induced noise and ground Read More ...

The Largest Diameter TBM in India Made by CRCHI will be used in Mumbai Coastal Road Project

On March 18, 2020, India’s largest diameter TBM was packed at CRCHI’s first industrial park in the Changsha city, central-south of China. It will pass through Shanghai Port to Mumbai for a costal road project. With an excavation Read More ...

CREG Φ15.8m Slurry TBM Solution for Chunfeng Tunnel in Shenzhen

Chunfeng Tunnel is the first bi-directional four-lane highway tunnel in Shenzhen, China, with two decks within one tunnel. The tunnel is 3,603m long; its average radius of curve is R750m and its biggest gradient reaches 49% Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week

Please publish modules in offcanvas position.