TERRATEC - Hard Rock Double Shield TBM starts operations in Vishnugad-Pipalkoti Hydropower project

The Double Shield TBM has been designed for the construction of a low-pressure head race tunnel, which is a crucial component of a hydroelectric power system. This TBM is equipped with customized features to efficiently complete the 13km tunnel. The team has been waiting to complete the drill and blast section of the project.
Published on:
08 November 2023
Published in: NBM&CW November 2023
Share:
We Value Your Comment




