TERRATEC - Hard Rock Double Shield TBM starts operations in Vishnugad-Pipalkoti Hydropower project

The Double Shield TBM has been designed for the construction of a low-pressure head race tunnel, which is a crucial component of a hydroelectric power system. This TBM is equipped with customized features to efficiently complete the 13km tunnel. The team has been waiting to complete the drill and blast section of the project.