A Tactical Shift Towards Performance Grading of Modified Bitumen

Flexible pavements are the most common type of pavement systems in the country. In addition to being convenient to construct, they are also cost-effective and easy to maintain. These pavements constitute the surface course and binder course and are made up of bitumen and mineral aggregates. Bitumen is the main binder which binds the aggregates together to act as a structural layer. It is very important to control the properties of bitumen as the performance of the constructed pavement is based on the properties of the bitumen used and subjected to different loading and climatic conditions.

To ensure that the bitumen used for the road construction is of the required quality, it should meet the specified requirements for an appropriate grade. The need for a grading system for bitumen was necessitated by the fact that about 250 uses of bitumen have been reported (Read and Whiteoak 2003). In pavements also, it is used for many different applications. Each application has specific requirements which it should meet. The grading system adopted for bitumen simplifies the entire process by specifying different grades to be used for different applications. The grading system has also evolved considerably over the years based on field performance and appropriate method of testing (Kandhal 2007).

Why bitumen modification is required?
A direct reflection of the growth of a country’s economy can be seen in the increased pace of development in its infrastructure sector where roads constitute a major component, and in which a major portion of the infrastructure funds is spent. In the present era of economic development, the traffic demands placed on our pavements are significantly more than in the past. The increase in traffic growth coupled with increased axle loads and climatic variations has posed challenges for the road agencies to look into the demands made on the bitumen pavement construction. A quest for improved road performance led to the modification of bitumen. In this regard, as early as in 1980’s, modification to base bitumen was done by addition of certain additives like polymers, natural rubber, crumb rubber etc. to enhance the mechanical behavior of bitumen by physical modification. Later, chemical modification was also attempted using polyethylene, poly phosphoric acid etc (Kumar and Veeraragavan 2008). Table 1 indicates the categories of modified bitumen as specified in IS:15462 (2004).

Table 1 : Categories of modified bitumen as per IS:15462 (2004)
S. No. Category of modified bitumen Type of modifier used for modification
(a) Type A – PMB(P) Plastomeric thermoplastics (eg. - Polyethylene, Ethylene-Vinyl Acetate copolymer, Ethylene-Methyl Acrylate copolymer, Ethylene-Butyl Acrylate copolymer)
(b) Type B – PMB(E) Elastomeric thermoplastic (eg. - Ethylene Ter polymer, Styrene-Butadiene-Styrene block copolymer, Styrene-Isoprene-Styrene copolymer) 
(c) Type C – NRMB Natural rubber and SBR latex
(d) Type D – CRMB Crumb rubber / treated crumb rubber

Each of these categories is further subdivided into three grades: based on penetration value for Type A, B and C, and based on softening point value for Type D. So, Type A modified bitumen is further graded into PMB (P)120, PMB(P)70 and PMB(P)40. Type B modified bitumen is graded into PMB (E)120, PMB(E)70 and PMB(E)40. Type C modified bitumen is graded into NRMB120, NRMB70 and NRMB40. Similarly, Type D modified bitumen is graded into CRMB50, CRMB55 and CRMB60. The viscosity was also incorporated in the specifications with ranges given against each bitumen grade.

The use of modified bitumen in road construction significantly reduces the amount and severity of pavement distresses and increase service life. The primary benefit of using modified binders is improved rutting resistance, improved thermal cracking resistance, along with secondary benefits such as an improvement in the overall mixture durability. Additionally, some modified binders provide improved stripping (moisture damage) resistance. An additional four to six years of pavement life from a pavement constructed using modified bitumen is a reasonable expectation (IRC:SP:53 2010).

Performance based grading in IS:15462-2019
It is commonly known that bitumen plays the key role in the behavior of bituminous mix and the overall performance of bituminous pavements. The accumulated strain in the bitumen, as a consequence of repeated traffic loadings, is responsible for the permanent deformation or rutting in the bituminous pavements. In order to identify the contribution of bitumen to pavement rutting, the parameter G*⁄sin δ has been used (IS:15462-2004). The parameter G*⁄sin δ is the high temperature specification parameter used to indicate the rutting performance and is obtained through DSR testing. In the DSR, a torque is applied to the bitumen sample placed between two parallel plates and response is measured. The specified criteria for rutting parameter G*⁄sin δ is 1.00 kPa for unaged and 2.2 kPa for the RTFO-aged binder. The criteria remain the same regardless of the location of the pavement and the high temperature to which it might be exposed to. The minimum values of test temperatures at which these criteria must be met are also specified regardless of the location of the pavement. However, researchers have reported that this rutting parameter (G*⁄sin δ) has poor correlation with field rutting (Carswell and Green 2000) and is inadequate in describing the rutting performance of polymer modified binders, in particular. In addition to the adoption of inadequate rutting parameter, the other shortcomings of IS:15462-2004 include:
  • Viscosity test is specified to be conducted at one standard temperature (150°C) without regard to the climate in which the bitumen will be used.
  • Only short-term aging is considered. The specification doesn’t take into consideration the long-term aging during the service life of the pavement.
  • It also doesn’t adequately capture the low temperature behavior/performance of bitumen. Only Fraass breaking point is to be identified for a particular grade of bitumen. Fraass breaking point may be modified / changed due to the addition of modifier. Also, it has been reported that the Fraass breaking point generally has a poor correlation with the low temperature behavior of bituminous mixtures (Lu et al. 2017). So, the specifications do not adequately describe the low temperature behavior of bitumen.
  • The specification requirements were different for the different types of additives, i.e. they were not blind to the modification.
From the pavement engineer’s point of view, modified bitumen is used to enhance the performance of the pavements, irrespective of the additive/modifier used for the modification purpose. Also, the properties of modifier are affected by the temperature and stress loadings. So, there was a need for a unified performance-based specifications for modified binders which should be blind to the modification. This essentially means that the specifications specify in clear terms the requirements for the particular binder grade; irrespective of the additive / modifier used to attain such properties. In other words, all bitumen of the same performance grade would be expected to perform the same in the same traffic / environmental conditions regardless of how they were produced. Such a specification would be a ‘win-win’ situation for both the bitumen users and producer. The producer is free to choose any particular additive / modifier for the modification purpose, based on his business interests, and meet the specified requirements. The user is confident of getting the modified bitumen (he need not worry about the additive/modifier used for the modification) which meets the performance-based requirements given in the specifications.

To take into account the above shortcomings, the performance-based grading was introduced in the revised specifications IS:15462 (2019). This was a tactical shift towards developing more robust specifications which relate well with the bitumen performance. Table 2 indicates the grades of modified bitumen specified in IS:15462 (2019) specifications.

Table 2: Grades of modified bitumen specified in IS:15462-2019
S. No. Binder grade Specified temperature ranges
1. PMB 64 -10 Average maximum pavement temperature < 64 °C and
Minimum pavement temperature > (-10) °C
2. PMB 70 -10 Average maximum pavement temperature < 70 °C and
Minimum pavement temperature > (-10) °C
3. PMB 76 -10 Average maximum pavement temperature < 76 °C and
Minimum pavement temperature > (-10) °C
4. PMB 82 -10 Average maximum pavement temperature < 82 °C and
Minimum pavement temperature > (-10) °C
5. PMB 76 -22 Average maximum pavement temperature < 76 °C and
Minimum pavement temperature > (-22) °C

The general format adopted for the nomenclature is PMB XX-YY. Here, ‘XX’ specifies the average maximum pavement temperature, at a depth of 20 mm, based on the high air temperature and latitude of the place of the project location. The data regarding the air temperatures can be obtained from the Indian Metrological Department (IMD). The formula relating air temperature and latitude with the pavement temperature is given below (IS:15462 2019) :

T20mm = 0.9545 ×( Tair - 0.00618 L2 + 0.2289 L + 42.2 ) - 17.78         (1)

Where, T20mm = average maximum pavement temperature at 20 mm below the road surface; Tair = high air temperature; and L = latitude in degrees for the place of project location.

The estimation of average maximum and minimum pavement temperature can be done as explained in the subsequent example for Delhi city. For example, Delhi has high air temperature of 48°C and its latitude is 28.7°N. So, the average maximum pavement temperature computed is 69.7°C. Therefore, PMB 70 should be used for Delhi conditions. Similarly, ‘YY’ specifies the minimum pavement temperature. The lowest air temperature is taken as minimum pavement temperature. For Delhi, the lowest air temperature recorded is 3 °C, which is taken to be the minimum pavement temperature. So, the grade of PMB to be chosen for Delhi is PMB 70-10. This chosen grade is only based on environmental conditions; ‘grade bumping’ might be needed depending on the traffic plying on the specific pavement. The concept of ‘grade bumping’ has been discussed in subsequent section.

Apart from introducing the grading based on the average maximum and minimum pavement temperatures, the other two significant changes in the new specifications are the inclusion of non-recoverable creep compliance (Jnr) based on multiple stress creep recovery (MSCR) testing and the use of long term aging parameter (G*⁄sin δ) with pressure aging vessel (PAV).

Why was MSCR test included?
During the measurement of the high temperature parameter, G*⁄sin δ, an oscillating load to the bitumen is applied at relatively low strain. Under a very low stress and strain level, it is unlikely that the polymer network in the modified bitumen would be really activated. So, in the present testing framework, the polymer is only viewed as a filler material that stiffens the bitumen (FHWA 2011). This is one of the reasons why the existing rutting parameter does not accurately represent the ability of polymer modified binders to resist rutting. However, the polymer chains in the modified bitumen can be rearranged substantially with increasing stress levels. Such higher levels of stress and strain are applied to the bitumen in MSCR testing, thereby better representing the actual field conditions experienced by the pavement. By using the higher levels of stress and strain in the MSCR test, the response of the bitumen captures not only the stiffening effects of the polymer, but also the elastic effects.

The MSCR test (ASTM D7405 (2015)) is carried out using a dynamic shear rheometer (DSR). It is based on the well-established creep and recovery test concept for the purpose of evaluating the binder’s potential for permanent deformation. The procedure involves applying a consecutive series of static loads, followed by a period of recovery to a binder sample. Using the DSR, a one-second creep load is applied to the aged bitumen sample. After the one-second load is removed, the sample is allowed to recover for nine seconds. The test starts with the application of a low stress (0.1 kPa) for 10 creep/recovery cycles, and then the stress in increased to 3.2 kPa and repeated for an additional 10 cycles. The testing for MSCR is done at the selected actual high pavement temperature with no grade bumping. Two separate parameters can be determined in the MSCR testing: non-recoverable creep compliance (Jnr) and percentage of recovery (MSCR Recovery) during each loading cycle. Values are reported as the average of ten loading cycles at each shear stress level. Physically, Jnr is a measure of the amount of residual strain left in the binder specimen after repeated creep and recovery, relative to the applied stress magnitude in kPa. The MSCR percent recovery is a measure of how much the sample returns to its previous shape after being repeatedly stretched and relaxed. The parameter Jnr has been found to correlate well with the field rutting data (D’Angelo 2009). If the bitumen meets the appropriate Jnr specification, then it is expected that the binder will minimize its contribution to rutting.

Though the main requirement for Jnr is determined at 3.2 kPa shear stress, the data determined at 0.1 kPa shear stress is also important. To minimize concerns that some bitumen may be overly sensitive to changes in shear stress and exhibit yielding at the higher stress level, another parameter Jnrdiff has been specified, whose maximum value should not exceed 75%. The formula to compute Jnrdiff is given in Equation (2).


Where, Jnr,0.1kPa = value of Jnr at stress level of 0.1 kPa; and Jnr,3.2 kPa = value of Jnr at stress level of 3.2 kPa.

Grade bumping through non-recoverable creep compliance (Jnr)

There was no concept of grade bumping in the original IS:15462-2004, however, the same has now been incorporated in the revised IS:15462-2019. The grade bumping is done on the basis of Jnr value. With MSCR, the bitumen testing is done at the high environmental temperature that the pavement is expected to experience. This means, if the pavement climate grade is PG64, the testing would be done at 64°C. A lower value of Jnr indicates a significant improvement in the stiffness of the bitumen. So, in order to accommodate for the higher traffic, lower value of Jnr would be required to reflect the increased stress the pavement will actually experience, without changing the testing temperature. Table 3 indicates the requirements of grade bumping for various service conditions

Table 3 : Jnr requirements for grade bumping
Service Condition  values Traffic Levels
Standard (S)   Traffic repetitions less than 10 million Equivalent Single Axle Loads (ESALs) and more than the standard traffic speed (more than 70 km/h)
Heavy (H)   Traffic repetitions between 10-30 million ESALs or slow-moving traffic (20 to 70 km/h)
Very Heavy (V)   Traffic repetitions of more than 30 million ESALs or very slow moving/standing traffic (less than 20 km/h)
Extremely heavy (E)   Traffic repetitions of more than 30 million ESALs and very slow moving/ standing traffic ( less than 20 km/h)

Conclusions and Way Forward
The present paper reviews the newly implemented IS:1546-2019. The new specifications include the MSCR testing and the grade bumping is done on the basis of Jnr value. Based on the review, the following conclusions may be drawn:
  • The non-recoverable creep compliance (Jnr) is better correlated with rutting potential than the original rutting parameter (G*⁄sin δ).
  • The MSCR testing is done corresponding to the actual pavement high temperature, regardless of traffic speed and loading. To account for the traffic loading and/or speed, grade bumping is done on the basis of the value of Jnr parameter, as given in Table 3.
  • There is a criterion to eliminate the binders that are overly stress sensitive and potentially susceptible to rutting in the field. This criterion is given by Jnrdiff and its acceptable value is less than or equal to 75 %.
  • The revised specifications for modified bitumen IS:15462 (2019) has still retained the conventional elastic recovery (ER) test (in the ductilometer) to evaluate the presence of polymer in binders. This may be replaced with the MSCR recovery which provides a better estimate of the established polymer network in the binder. Higher value of MSCR recovery indicates more robust cross-linked polymer structure. In order to validate that the bitumen has been polymer-modified, a minimum requirement for MSCR recovery value may be included in the specifications, in place of the conventional elastic recovery test. Adopting the MSCR recovery in place of ER would provide the added advantage as the MSCR test is relatively simple and quicker to perform compared to ER testing.
  • Better test methods such as bending beam rheometer testing should be included in place of Fraass breaking point to describe the low temperature behavior of modified bitumen.
Acknowledgement
The authors would like to thank Prof. (Dr.) Satish Chandra, Director, CSIR-Central Road Research Institute (CSIR-CRRI), New Delhi, for his kind permission to publish this paper.

Disclosure statement
No potential conflict of interest was reported by the authors.

References
  • ASTM-D7405. (2015). Standard test method for multiple stress creep and recovery (MSCR) of asphalt binder using a Dynamic Shear Rheometer. American Society for Testing of Materials (ASTM).
  • Carswell, J., and Green, P. J. (2000). Prediction of rutting resistance in hot rolled asphalt using rheological parameters. The Asphalt Yearbook 2000, Institute of Asphalt Technology, UK.
  • D’Angelo, J. A. (2009). “The relationship of the MSCR test to rutting.” Road Materials and Pavement Design, Taylor & Francis Group, 10, 61–80.
  • FHWA. (2011). The Multiple Stress Creep Recovery (MSCR) Procedure. Office of Pavement Technology - FHWA-HIF-11-038.
  • IRC:SP:53. (2010). Guidelines on use of modified bitumen in road construction. Indian Roads Congress, New Delhi, India.
  • IS:15462. (2004). Polymer and rubber modified bitumen - Specification. Bueau of Indian Standards, New Delhi.
  • IS:15462. (2019). Polymer modified bitumen - Specification. Bureuu of Indian Standards, New Delhi.
  • Kandhal, P. S. (2007). “An overview of the viscosity grading system adopted in India for paving bitumen.” Indian Highways, 35(4).
  • Kumar, S. A., and Veeraragavan, A. (2008). “Needed characterisation of modified binders in India.” New Building Materials and Construction World, 14(3).
  • Lu, X., Uhlback, P., and Soenen, H. (2017). “Investigation of bitumen low temperature properties using a dynamic shear rheometer with 4 mm parallel plates.” International Journal of Pavement Research and Technology, Elsevier B.V., 10(1), 15–22.
  • Read, J., and Whiteoak, D. (2003). The Shell Bitumen Handbook, 5th edition. The Shell Bitumen Handbook, Thomas Telford Ltd, UK.
Click Here
To Know More or to Contact the Manufacturer
Please fill in your details
Choose Title from the listPlease let us know your name.
Invalid Input
Please let us know your Designation.
Please let us know your email address.
Please let us know your City.
Please let us know your Contact Number.
Please brief your query.
Our other Value-Added Services:

To receive updates through e-mail on Products, New Technologies & Equipment, please select the Product Category(s) you are interested in and click 'Submit'. This will help you save time plus you will get the best price quotations from many manufacturers, which you can then evaluate and negotiate.

Equipment & Machinery
Invalid Input
Building Products
Invalid Input
Invalid Input
Ashoka Buildcon Achieves New Milestones at Bundelkhand Expressway

Ashoka Buildcon Achieves New Milestones at Bundelkhand Expressway

The Bundelkhand Expressway is a 296-km long, 4-lane wide (expandable to 6 lanes) access-controlled expressway in the state of Uttar Pradesh. It will connect Gonda village in Chitrakoot district with Agra–Lucknow Read More ...
Purvanchal Expressway Package-3

Purvanchal Expressway Package-3

This case study briefly discusses the planning, design and construction of Package 3 of the Purvanchal Expressway. Package-3 of the Purvanchal Expressway is a 41.7km long section of the 340.82km long Read More ...
Pavement Rehabilitation Design is Not New Pavement Design

Pavement Rehabilitation Design is Not New Pavement Design

Since the 1980’s billions of dollars have been invested in developing methods to make pavement design and construction more sustainable through the re-use of existing resources. This includes insitu recycling and Read More ...
Higher Percentage of RAP – Is it Challenging?

Higher Percentage of RAP – Is it Challenging?

India has the second largest road network in the world, spanning a total of 5.89 million km, transporting 64.5% of all goods in the country. Nearly 90% of India's total passenger traffic uses the road network to commute Read More ...
Waste-Plastic Roads

Waste-Plastic Roads

India generates nearly 26,000 tonnes of plastic waste every day, making it the 15th biggest plastic polluter globally. Discarded plastic waste litter the country’s roads, rivers and also form huge mounds in garbage Read More ...
Brickwork Ratings: Tweaking of Hybrid Annuity Model (HAM) a Positive for Roads Sector

Brickwork Ratings: Tweaking of Hybrid Annuity Model (HAM) a Positive for Roads Sector

According to Vipula Sharma, Director – Ratings, Brickwork Ratings, with the recent tweaking in the HAM model, the share of the projects awarded under HAM model is expected to increase. “Overall, there should be a Read More ...
IJM India Infrastructure Ltd. Sets a Record of Laying 25.54-km lane in 17:45 hours

IJM India Infrastructure Ltd. Sets a Record of Laying 25.54-km lane in 17:45 hours

After creating a world record for laying Pavement Quality Concrete (PQC) for a four-lane highway of 2,580 meters length within 24 hours, NHAI has made yet another record by completing a single lane of the four-lane Read More ...
Ashoka Buildcon creating history with India’s First 8 – Lane Extradosed Bridge

Ashoka Buildcon creating history with India’s First 8 – Lane Extradosed Bridge

Ashoka Buildcon, a leading highway player in India, has an impressive portfolio of 39 PPP projects, which is the largest in number in the country. With 40 years of experience in the core business of Highway Construction Read More ...
Concreting the History - Patel Infrastructure Creates World Record for Laying Pavement Quality Concrete for a 2,580-m long, four-lane highway

Concreting the History - Patel Infrastructure Creates World Record for Laying Pavement Quality Concrete for a 2,580-m long, four-lane highway

Patel Infrastructure, an established construction, development, and maintenance service company and a NHAI contractor, has created a world record in the Infrastructure sector by laying Pavement Quality Concrete (PQC) for Read More ...
Macro Synthetic Fibres and Pavement Concrete

Macro Synthetic Fibres and Pavement Concrete

Macro synthetic polymeric fibres have the potential to enhance the post cracking properties of hardened cement-based materials, besides bringing improvements in other properties such as durability. This article disseminates Read More ...
Road Pavement Design in Frost Prone Areas

Road Pavement Design in Frost Prone Areas

High altitude areas which are subjected to heavy snowfall and frost action necessitate special consideration for design and construction of pavements. U.K.Guruvittal, Chief Scientist & Dr G Bharath, Scientist, CSIR-Central Read More ...
Roller Compacted Concrete For Pavement Applications

Roller Compacted Concrete For Pavement Applications

Roller Compacted Concrete is an innovative technology gaining popularity in the recent past due to some of the positive points like low cost of construction, speed in construction, and the possibility of using mineral Read More ...
Port Road Pavements Design And Economic Considerations for Case of Appropriateness

Port Road Pavements Design And Economic Considerations for Case of Appropriateness

Ports are among key components of country’s infrastructure whose performance metrics have improved considerably over years. While Indian coastline has 12 major ports handling about 75 percent of India’s port traffic Read More ...
Suggestive Framework for Mitigating Project Delays in Indian Roads & Highways Sector

Suggestive Framework for Mitigating Project Delays in Indian Roads & Highways Sector

Time delay had been a common phenomenon associated with nearly all road construction projects in India but very little effort and studies had been done to amputate the phenomenon.The objectives of this study provided industry Read More ...
Characterisation of Foundry Sand Waste Material for Road Construction

Characterisation of Foundry Sand Waste Material for Road Construction

Characterisation of Foundry Sand Waste Material for Road Construction Different types of waste materials viz. copper slag, zinc slag, steel slag, manganese slag, phosphogypsum slag, cinder, red mud, kimberlite, lime sludge, foundry sand, coal ash, jarofix, jarosite, manganese slag, marble dust etc Read More ...
Thin Whitetopping Cement Concrete Overlays on Bituminous Pavements:

Thin Whitetopping Cement Concrete Overlays on Bituminous Pavements:

Concrete is a very durable and versatile material for the construction of roads and highways. Several highways, expressways, and city roads have been constructed with cement concrete in the recent past in India. Cement concrete Read More ...
A Transformative Approach to Highway Construction

A Transformative Approach to Highway Construction

An 18-mile stretch of Georgia interstate is pushing the technological envelope with respect to safety and sustainability in road construction. By leveraging solar energy, recycled tires, vehicle telematics data and valuable roadside Read More ...