Study on Discomfort Degree Hours of Building Treated with Different Thermal Insulating Materials by Computer Software
B. M. Suman, Principal Technical Officer, CSIR-Central Building Research Institute, Roorkee.
Introduction
The most common application of degree day is the analysis of energy consumption in existing buildings. Since energy demand for space conditioning (heating or cooling) has a linear relationship with temperature difference, which follows that there should be a linear relationship between energy consumed and discomfort degree hours in a year. By using this theoretical1 approach, monthly or annually energy estimate can be calculated for heating and cooling. Degree day provides a simple estimation of annual load of a building for a location based on tabulated discomfort degree hour value. This method2 may be used with accuracy where a building use, HVAC equipment efficiency, indoor temperature and internal gains are relatively constant. The energy analysis method3 is called a bin method and is often used where equipments have efficiency as a function of outdoor air temperature. Amongst two main uses of discomfort degree hours in building, one is to estimate energy consumption4 due to space conditioning for new building and major refurbishment for ongoing energy monitoring and analysis of existing buildings. Degree days are essentially the summation of temperature difference over time and hence they capture both extremity and duration of indoor temperatures. The temperature differences are between a reference temperature or threshold temperature and the indoor air temperature. Cooling or heating discomfort degree hours are calculated from temperatures below or above the threshold winter or threshold summer temperatures respectively. The heating or cooling energy (KWh) demand is equal to the product of overall heat loss or gain coefficient and respective degree hours.This is a premium article available exclusively for our subscribers.
If you are already a subscriber, please Login
If not, subscribe now and get access to well researched articles & reports on infrastructure construction, equipment & machinery, innovations & technology, project reports, case studies, and more. All this by simply paying just ₹200/- for a month of complete portal access, or a discounted rate of ₹1000/- for a full year of access.
NBM&CW July 2014