NBM&CW - New Building Materials & Construction World

Electrokinetics A New Era in Soil Transformation

Electrokinetics A New Era in Soil Transformation

Electrokinetic technology uses controlled electric fields to improve soft soils, aid consolidation and support ground stability, remediation and infrastructure....

BKT CVR distribution facility inauguration in Sankagiri, Tamil Nadu

BKT Tyres Opens 10,000 Sq Ft CVR Distribution Facility in Tamil Nadu

BKT opens a 10,000 sq. ft. CVR distribution facility in Sankagiri, Tamil Nadu, improving tyre availability and support for fleet operators across eight markets....

From Progress to Planet Responsibility

From Progress to Planet Responsibility

Dr. L.R. Manjunatha traces industrial revolutions and their climate impacts, exploring sustainable innovation and a responsible path for future development....

MB Crusher equipment in operation and exhibition attachments

MB Crusher Enters Demolition Category in India

MB Crusher enters India’s demolition category with interchangeable-jaw pulverizers and crusher attachments, backed by its established service network. ...


Infrastructure Resilience Begins Below the Ground

Infrastructure Resilience Begins Below the Ground

Somnath Biswas explains how subsurface engineering, geotechnical precision and ground monitoring build safer, sustainable and resilient infrastructure....

JK Tyre representatives with new off-the-road tyres

JK Tyre Unveils New Generation of OTR Tyres

JK Tyre unveils new OTR tyres for construction, mining and material handling, with MPT 45, MPT117 and JDO XD patterns focused on durability and performance. ...

Ventilation duct in a large underground cavern

Design & Planning of Ventilation Systems for Construction of Large Underground Caverns

CFD analysis of the Dibang Hydropower Project examines staged cavern ventilation, duct configurations, airflow, pressure losses and fan power requirements....

Yamuna River bridge well foundations

Short Termination of a Well Foundation for the Pier Mkd. P3 Due to Hard Strata Encountered Above the Design Founding Level

A Yamuna River bridge case study examines revised geotechnical and hydraulic assessments enabling safe short termination of the Pier P3 well foundation....