NBM&CW - New Building Materials & Construction World

MB Crusher equipment in operation and exhibition attachments

MB Crusher Enters Demolition Category in India

MB Crusher enters India’s demolition category with interchangeable-jaw pulverizers and crusher attachments, backed by its established service network. ...

Engineering Comfort and Seismic Resilience in Tall Residential Towers

Engineering Comfort and Seismic Resilience in Tall Residential Towers

Explore how a roof-level hysteretic tuned mass damper improves wind comfort and seismic resilience in a 173 m residential tower in Gurugram, India....

Infrastructure Resilience Begins Below the Ground

Infrastructure Resilience Begins Below the Ground

Somnath Biswas explains how subsurface engineering, geotechnical precision and ground monitoring build safer, sustainable and resilient infrastructure....

SCHWING Stetter India facility opening

SCHWING Stetter India Ready To Compete Globally

SCHWING Stetter India showcases concrete equipment, electric and CNG mixers, intelligent controls and manufacturing capabilities designed for global markets. ...


Volvo EC650 mining excavator launch

Volvo Spotlights EC650 Mining Excavator Alongside Compactors and Electric Equipment

Volvo showcases its EC650 mining excavator, compactors and electric equipment, with connected services and lifecycle support for Indian mining customers. ...

Electrokinetics A New Era in Soil Transformation

Electrokinetics A New Era in Soil Transformation

Electrokinetic technology uses controlled electric fields to improve soft soils, aid consolidation and support ground stability, remediation and infrastructure....

Silkyara tunnel portal and construction safety

Tunnel Safety From Concept to Operation

R.K. Dhiman and M. Jain examine tunnel safety from planning to operation, covering ground control, ventilation, emergency response and lifecycle monitoring....

Yamuna River bridge well foundations

Short Termination of a Well Foundation for the Pier Mkd. P3 Due to Hard Strata Encountered Above the Design Founding Level

A Yamuna River bridge case study examines revised geotechnical and hydraulic assessments enabling safe short termination of the Pier P3 well foundation....