NBM&CW - New Building Materials & Construction World

JK Tyre representatives with new off-the-road tyres

JK Tyre Unveils New Generation of OTR Tyres

JK Tyre unveils new OTR tyres for construction, mining and material handling, with MPT 45, MPT117 and JDO XD patterns focused on durability and performance. ...

From Progress to Planet Responsibility

From Progress to Planet Responsibility

Dr. L.R. Manjunatha traces industrial revolutions and their climate impacts, exploring sustainable innovation and a responsible path for future development....

Infrastructure Resilience Begins Below the Ground

Infrastructure Resilience Begins Below the Ground

Somnath Biswas explains how subsurface engineering, geotechnical precision and ground monitoring build safer, sustainable and resilient infrastructure....

MB Crusher equipment in operation and exhibition attachments

MB Crusher Enters Demolition Category in India

MB Crusher enters India’s demolition category with interchangeable-jaw pulverizers and crusher attachments, backed by its established service network. ...


Climate-Resilient Marine Concrete

Climate-Resilient Marine Concrete

Climate-resilient marine concrete combines low-carbon materials, climate-adjusted service-life design, monitoring and adaptation for coastal infrastructure....

BKT CVR distribution facility inauguration in Sankagiri, Tamil Nadu

BKT Tyres Opens 10,000 Sq Ft CVR Distribution Facility in Tamil Nadu

BKT opens a 10,000 sq. ft. CVR distribution facility in Sankagiri, Tamil Nadu, improving tyre availability and support for fleet operators across eight markets....

Masa and Super Tiles representatives mark the L9.1 paver block plant agreement

Masa GmbH Partners with Super Tiles to Deploy Advanced L9.1 Paver Block Plant in Bangalore

Masa GmbH partners with Super Tiles in Bangalore for an automated L9.1 block plant, adding high-precision paver production and advanced curing technology. ...

Yamuna River bridge well foundations

Short Termination of a Well Foundation for the Pier Mkd. P3 Due to Hard Strata Encountered Above the Design Founding Level

A Yamuna River bridge case study examines revised geotechnical and hydraulic assessments enabling safe short termination of the Pier P3 well foundation....